Projects

2004

Polimex-Cekop-Moder Sp. z o.o. - Glinojeck Sugar Plant S.A. ( related to modernization and extension of a processing plant to 12000 t/d)
- production and assembly of initial defecation system
- modernization of second carbonation plant using static bubblers

Cukrownia Glinojeck S.A Glinojeck Sugar Plant S.A.
- production and assembly of initial defecation technological lines- 25 T

Cukrownia Glinojeck S.A Glinojeck Sugar Plant S.A.
- production and assembly of G.P. - 100 Boilers
- production and assembly of stainless steel filters
- production and assembly of steel structure
- thermal isolation of G.P. - 100 Boilers

Cukrownia Glinojeck S.A Glinojeck Sugar Plant S.A.
Modernization of second carbonation station

Cukrownia Glinojeck S.A Glinojeck Sugar Plant S.A.
Production of gravitational inflow system with concentrated juice bag filters (replacing plate filters)

SugarTol Polska Sp. z. o.o. - Guzów Sugar Plant
Dismantling of production warehouse

SugarTor Sp z. o.o.  - Cukrownia Dobre Glinojeck Sugar Plant S.A.
- Assembly of crane beams
- Production and assembly of GP Filers steel structure
- Assembly of G.P. Filters

SugarTor Sp z. o.o.  - Cukrownia Dobre Glinojeck Sugar Plant S.A.
Dismantling works:
Disassembly of 2 heaters, placing new support steel structures and reassembly

2003

Polimex-Cekop-Moder Sp. z o.o. - Glinojeck Sugar Plant S.A. ( ( related to modernization and extension of a processing plant to 9000 t/d) 
Modernization of first carbonation plant using static bubbler
Production and assembly of high-duty juice heater for second carbonatation plant

Glinojeck Sugar Plant S.A.
Modernization of first carbonation station

Glinojeck Sugar Plant S.A.
General Contractor in factory modernization. Scope of works included:
- Assembly of mixer: dia. 5,2 m; height: 18,5 m; weight: 67 T
- Assembly of vertical mixer - 2 sets: dia. 5,2 m; height: 9 m; weight: 26T, 29,5T 
- Assembly of Putsch Press Machine: weight 14T, length: 11 m

Glinojeck Sugar Plant S.A.
Dismantling of technological equipment, installations and buildings:
- Disassembly of strike pans: 8 sets, each weight 28 T
- Disassembly of plate heaters: 8 sets, weight: 2,5 T - 4,5 T
- Disassembly of compressors and tanks – 4 sets
- Demolition of Rosberg building, total cubic volume 6800 m3
- Disassembly of steel construction of tippler hydraulic
- Demolition of the tippler hydraulic unit building, total cubic volume 1200 m3
- Disassembly of tippler devices, total weight 270 T  

Sugarpol Polska Sp z. o.o.  - Sugar Plant Kętrzyn
Dismantling of technological equipment:
Disassembly of mixer (parameters: dia. 5,2 m; height: 18,5 m; weight: 67 T) and relocation to Glinojeck Sugar Plant

SugarTor Polska Sp z. o.o.  - Sugar Plant Guzów
Factory Relocation:
Disassembly of vertical mixers - 2 sets (parameters: dia. 5,2 m; height: 9 m; weight: 26 T and 29,5 T) and relocation to Glinojeck Sugar Plant

Sugarpol Polska Sp z. o.o.  - Sugar Plant Ciechanów
Plant relocation:
Disassembly of Putsch Press Machine (parameters: weight 14T, length: 11 m) and relocation to Glinojeck Sugar Plant
Disassembly of first and second carbonation tanks
Disassembly of carbonation devices
Relocation of carbonation equipment to Ostrowite Sugar Plant

SugarTor Sp z. o.o.  -Sugar Plant Dobre
- Assembly of crane beam
- Production and assembly of G.P. Filters support steel structure 
- Assembly of G.P. Filters - 2 sets

Sugarpol Polska Sp z. o.o.  -Sugar Plant Ostrowite
Production and assembly of flat-belt conveyor casings

Sugarpol Polska Sp z. o.o.  - Sugar Plant Unisław
- Civil engineering works - connection between production facility and sugar warehouse
- Assembly of sand-trap - 50 T
- Repairs of technological pipelines for carbonation, beet washer and beet pulp mixer
- Production of juice filters and pipeline connection
- Service during sugar beet campaign

2002

Glinojeck Sugar Plant S.A.
General Contractor in factory modernization. Scope of works included:
- Production of stainless steel mixers
- Modernization of aeration chamber and inflow to sewage treatment plant
- Production of pressing water tank; acid resistant steel
- Production of sewage heating plant
- Production of sewage aeration plant in K.N. II
- Production of juice sulfitation plan
- Production of strike pan and massecuite heating system
- Modification of third massecuite outflow from horizontal to vertical mixers
- Production of bag filters with concentrated juice and standard liquor filter system
- Repair of pump inflow for the water tray
- Production of third massecuite heating system with vertical mixers
- Modification of effluent collector from screens
- Replacement of fresh water pipeline
- Production of platform, trestle bridge and communication route structures (2000 t)
- Installation of station roof for loading dried beet pulp (total capacity 2400 m3)
- Modernization of sugar transport system; acid resistant steel
- Replacement of vacuum valves for intermediate and third massecuite strike pans
- Installation of molasses strike pans
- Replacement of molasses transport pipelines from production to molasses tanks; ND 150 - 840 meters
- Replacement of DN 15 - DN 1220 technological pipelines
- Installation of calcium carbonate preparation plant
- Installation of calcium carbonate preparation and carbonatation plant
- Installation of whitewash carbonatation plant
- Preparation of anticorrosive protection and thermal insulation
- Installation of emergency thermal system for molasses tanks
- Emergency replacement of tubes in heaters
- Technical maintenance of the sugar beet campaign
- Replacement of pipeline in evaporators
- Replacement of pipelines from sulfitation to vacuum filters; acid-resistant steel
- Repair of lime mud DN 150 pipeline - 150 meters

 

BE.FREE & CMS Toruń